Kitchen Remodel F.A.Q.'s

 

How much do your kitchen cabinets cost? 

 

Every kitchen is different- we have basic builder grade cabinets all the way up to completely custom made cabinets. Sizes, types, finishes all affect price. Just make an appointment and bring in your drawing or schedule a free in-home kitchen measure. We'll have you priced out in no time.

How do we get started?

 

The best way is to schedule an appointment to come in to our Novi showroom. Call or email us and we'll set up a private consultation. This usually takes 30-60 minutes. We'll explain the entire process so you can begin planning your project.

What cities do you work in?

 

We mostly work in southeast Michigan but can work in Lansing, Flint, Toledo, and Ann Arbor.

Do you install cabinets?

 

Yes, we have professional carpenters that can install your kitchen cabinets. 

Describe the steps it takes to remodel my kitchen?

 

After we design your kitchen and you make your finish selections - we receive your materials, then begin the process:

 

1. Demolish & haul away existing kitchen which may include old cabinets, counter tops, flooring, drywall, etc. Usually takes 1-2 days.

 

2. Prep work is done including electrical, plumbing, drywall and HVAC. Can take 1-14 days:

 

Electrical: Move, add, delete outlets, switches, and circuits.

Plumbing: Move water supply & drain lines as needed. Add gas line if needed.

Drywall: Remove, repair, replace drywall on ceiling & walls.

HVAC: Move, add or delete heating/cooling ducts

 

3. Installation of kitchen cabinets. Usually takes 1-5 days.

 

4. Follow up electrical and plumbing. Usually takes 1-3 days.

 

5. Installation of stone couter tops. About 1-2 weeks after cabinets installed. Usually installed in one day.

 

6. Installation of tile back splash. Usually takes 2-3 days.

 

7. Completion of punch list. 

HOw long will it take to remodel my kitchen?

 

Your kitchen remodeling start date will depend on how long it takes for the cabinets to arrive. Once we have your cabinets most basic kitchen remodels can be completed in about 2-3 weeks however we don't under any circumstances guarantee delivery or completion dates. Demolishing your old kitchen and installing the new cabinets is usually completed the in one week. Granite or quartz counters are then installed in about 1-2 weeks. Again, counter top installation time is not guaranteed. Plumbing & electrical are completed soon after.

What other services do your offer?

 

We offer complete kitchen remodeling including:

 

  • 3D Kitchen design complete with elevations, plan view & renderings

  • Kitchen cabinets - authorized dealer for 9 factories.

  • Granite & quartz counter tops including Cambria Quartz.

  • Demolition of existing kitchen - includes haul away.

  • Full electrical services performed by a licensed electrician

  • Full plumbing services - performed by a licensed plumber

  • Wood flooring - install new flooring or re-finishing existing wood floors

  • Tile floors and back splashes

  • LED under cabinet lighting

  • Installation of kitchen appliances including dishwashers, microwaves, double ovens, refridgerators, wine coolers, trash compactors, stove, range, etc.

How do you handle extra's?

 

We try to include everything you need in our original estimate. If something comes up we could not have foreseen we will quote you how much the extra work will cost before we do it. We are fair and reasonable when it comes to these costs.

What are all the items to consider in a kitchen remodel?

 

Here' a list of the items we typically price in your estimate:

 

  • Demolition & removal of existing kitchen componenets.

  • Plumbing

  • Electrical

  • Flooring - wood or tile

  • Cabinets

  • Counter tops

  • Tile back splash

  • LED under cabinet lighting

  • Crown molding

  • Base molding

  • Shoe molding

  • Spice racks

  • Wine racks

  • Waste pullouts

  • Roll out trays (shelves)

  • Sofit removal & drywall repair

  • Appliance installation - refridgerator, dishwasher, microwave, hood, double oven, etc.

  • Recessed lighting

  • Installation of knobs and pulls (door/drawer handles)

  • Window casing

© 2023 by THE BUILDER. Proudly created with Wix.com 

  • w-facebook
  • badge125_125_Houzz.png